{"id":11047,"date":"2024-04-15T09:25:42","date_gmt":"2024-04-15T09:25:42","guid":{"rendered":"https:\/\/thepkmedia.com\/?p=11047"},"modified":"2024-04-15T09:25:42","modified_gmt":"2024-04-15T09:25:42","slug":"abu-dhabi-awards-contract-first-waste-energy-facility","status":"publish","type":"post","link":"https:\/\/thepkmedia.com\/?p=11047","title":{"rendered":"Abu Dhabi awards contract for first waste-to-energy facility"},"content":{"rendered":"<p>A joint venture between Dubai&#8217;s Alec Engineering and Contracting (Alec) and Lebanon&#8217;s Butec has secured a contract to design and construct Abu Dhabi&#8217;s inaugural waste-to-energy plant.<\/p>\n<p>According to a statement by Alec, the joint venture will collaborate with Hitachi Zosen Innova, a Swiss-based cleantech company, for the project.<\/p>\n<p>Situated near the Al-Dhafra landfill, the facility is being developed by state-owned Emirates Water and Electricity Company (Ewec) and Abu Dhabi Waste Management Company (Tadweer). It is slated to process 900,000 tonnes of non-recyclable waste annually for the next 30 years.<\/p>\n<p>The project&#8217;s objective is to mitigate the release of over 1 million tonnes of CO2-equivalent emissions annually. Additionally, the plant will contribute 80 megawatts of power generation capacity from a non-fossil fuel source.<\/p>\n<p>The Alec-Butec joint venture will manage the engineering, procurement, and construction of all non-process-related activities. This includes civil engineering, concrete and structural steel work, as well as the installation of mechanical, electrical, and plumbing systems, along with building services.<\/p>\n<p>Abu Dhabi&#8217;s non-oil growth has been stimulated by its manufacturing sector, positioning it as a global contender in life sciences. The emirate is also aiming to create 178,000 new jobs in the tourism industry.<\/p>\n<p>Furthermore, the waste-to-energy project will encompass managing external works and site infrastructure development. However, specific details regarding financial aspects and construction timelines have not been provided.<\/p>\n<p>According to reports from the UAE state-backed Wam news agency in March 2023, the waste-to-energy project is targeted to commence commercial operations in the fourth quarter of 2026.<\/p>\n<p>Alec, which is owned by the Investment Corporation of Dubai, has partnered with Butec, partially owned by the International Finance Corporation, a member of the World Bank Group, for this project.<\/p>\n<div class='share-to-whatsapp-wrapper'><div class='share-on-whsp'>Share on: <\/div><a data-text='Abu Dhabi awards contract for first waste-to-energy facility' data-link='https:\/\/thepkmedia.com\/?p=11047' class='whatsapp-button whatsapp-share'>WhatsApp<\/a><div class='clear '><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>A joint venture between Dubai&#8217;s Alec Engineering and Contracting (Alec) and Lebanon&#8217;s Butec has secured a contract to design and construct Abu Dhabi&#8217;s inaugural waste-to-energy plant. According to a statement by Alec, the joint venture will collaborate with Hitachi Zosen Innova, a Swiss-based cleantech company, for the project. Situated near the Al-Dhafra landfill, the facility [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":11048,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21555,27835],"tags":[],"yst_prominent_words":[],"_links":{"self":[{"href":"https:\/\/thepkmedia.com\/index.php?rest_route=\/wp\/v2\/posts\/11047"}],"collection":[{"href":"https:\/\/thepkmedia.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thepkmedia.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11047"}],"version-history":[{"count":2,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=\/wp\/v2\/posts\/11047\/revisions"}],"predecessor-version":[{"id":11050,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=\/wp\/v2\/posts\/11047\/revisions\/11050"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=\/wp\/v2\/media\/11048"}],"wp:attachment":[{"href":"https:\/\/thepkmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11047"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11047"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11047"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/thepkmedia.com\/index.php?rest_route=%2Fwp%2Fv2%2Fyst_prominent_words&post=11047"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}